Modified Bookmobile Service - September 15-18

Bookmobile has the following schedule modifications. Thank you for your patience. 

Monday, September 15

  • Mohawk College, 12-1pm - Cancelled

Tuesday, September 16

  • Greencedar, 4-5pm - Cancelled

Wednesday, September 17

  • Helen Detwiler - Changed to 11-11:30am

Thursday, September 18

  • Meadowlands - Changed to 3:30-4pm
  • Bennetto - Changed to 4:45-5:30pm
 
 
1
Affected Branch: Bookmobile
Nearest Branches: 
Published:
Friday, September 12, 2025 - 3:00pm
Replacement and Damage Fees Resume October 1st

To avoid a replacement or lost fee, please return library materials due October 1st or later within 28 days. Replacement fees are intended to encourage Members to return items on a timely basis so everyone in the community can enjoy them. 

https://www.hpl.ca/news/frequently-asked-questions

All Branches and Bookmobile Stops
Published:
Thursday, September 11, 2025 - 3:00pm
Central Library - Fourth Floor Temporary Closure

Central Library's Fourth Floor is closed on Tuesday, September 16, from Noon to 6 pm due to a special event. Makerspace and Newcomer Learning Centre will remain open. Floors 1-3 are available as study and work spaces. www.hpl.ca/central

1
Affected Branch: Central Library
Published:
Wednesday, September 10, 2025 - 10:00am
Kenilworth Branch - Temporary Closure (Sept 2 - Oct 10)

Due to roof repair maintenance, the Branch is temporarily closed from September 2 until October 10. Please visit the Red Hill, Parkdale, and Barton locations as your nearest branches for your library needs. On August 28-29, there may be some noise disruptions and limited parking spots while the roof repair set-up begins. Thank you for your patience.

1
Published:
Monday, August 11, 2025 - 8:00am

Red Hill Creek Expressway Books: 1997

Red Hill Creek Watershed Plan: surface water report

Regional Municipality of Hamilton-Wentworth

July 1997

CA3ONHWAO5 97 R233

 

Red Hill Creek Watershed Study: report on known and potential contaminant sources: draft for discussion

Regional Municipality of Hamilton-Wentworth

July 10, 1997

CA3ONHWAO5 97 R263D

 

Red Hill Creek Watershed Plan: Water Quality Report

Regional Municipality of Hamilton-Wentworth

August 1997

CA3ONHWAO5 97 R232

 

Canadian Environmental Assessment Agency: ministerial guidelines: Canadian Environmental Assessment Act, s.58(1)(a): procedures for an assessment by a review panel

Red Hill Creek Expressway Review Panel

November 1997

CA1EA99 RM4

 

Red Hill Creek Watershed Study: Report on Known and Potential Contaminant Sources

Regional Municipality of Hamilton-Wentworth

December 11, 1997

CA3ONHWAO5 97 R236

 

Alive and well [video-recording]: a report on the Red Hill Valley Environmental Rehabilitation Project

CSW Productions

1997

R333.7209713 ALI (2nd floor)

 

A fluvial geomorphologic assessment of Red Hill Creek and its tributaries

Regional Municipality of Hamilton-Wentworth. Special Projects Office

1997?

R551.4420971352 FLU CESH

CA3ONHWAO5 97 R43

 

Red Hill Creek Expressway: North South Section: Community Stakeholders Committee

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 C57

 

Red Hill Creek Expressway: North-South section: impact assessment and design process: existing air quality draft technical report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R241D

 

Red Hill Creek Expressway: North-South section: impact assessment and design process: existing fisheries draft technical report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R239D

 

Red Hill Creek Expressway: North-South section: impact assessment and design process: existing hydrogeological conditions draft technical report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R240D

 

Red Hill Creek Expressway: North-South section: impact assessment and design process: existing noise draft technical report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R243D

 

Red Hill Creek Expressway: North-South section: impact assessment and design process: existing surface water and water quality draft technical report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 F242D

 

Red Hill Creek Expressway: North-South section: impact assessment and design process: existing terrestrial resources draft technical report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R238D

 

Red Hill Creek Expressway North-South Section: Impact Assessment and Design Process: Visual Assessment - Escarpment Crossing Baseline Inventory and Impact Predictions

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R232D

 

Red Hill Creek Expressway: North South section: Information Brief

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 I51

 

Red Hill Creek Watershed Plan: Cultural Heritage Resources Technical Report -- Draft Version

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R231D

 

The Red Hill Creek Watershed Plan: Cultural Heritage Resources Inventory: Technical Report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R231

 

Red Hill Creek watershed plan: hydrogeological inventory

Prepared for the Regional Municipality of Hamilton-Wentworth by Terraqua Investigations Ltd. in association with Blackport and Associates.

1997

R553.790971352 TER CESH

CA3ONHWAO5 97 R237

 

Red Hill Creek Watershed Plan Study: Soils and Geology

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R235

 

Red Hill Creek Watershed Plan: Surface Water Report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R233

 

Red Hill Creek Watershed Plan: Terrestrial Resources -- Phase One Background Inventory -- Draft Technical Report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R232D

 

Red Hill Creek Watershed Plan: Terrestrial Resources: Phase 1 background inventory: technical report

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R232

 

Red Hill Creek Watershed Study: Fisheries -- Phase One: Background Inventory (Working Draft for Discussion)

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R234D

 

Red Hill Creek Watershed Study: Fisheries: Phase 1: background inventory

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R234

 

Soils and geology: Red Hill Creek watershed plan study

Regional Municipality of Hamilton-Wentworth. Special Projects Office

1997?

R551.700971352 SOI CESH

 

State of the Watershed report: Red Hill Creek Watershed Planning

Regional Municipality of Hamilton-Wentworth

1997

R333.70971352 STA CESH

 

Red Hill Creek Watershed Planning Process: first generation plan for discussion: second draft

Regional Municipality of Hamilton-Wentworth

1997

CA3ONHWAO5 97 R244D