The accessible washroom at Ancaster Branch is not working. We aim to get it fixed quickly.
Due to an all-day special event, the 4th Floor is closed on Saturday, October 25, from 8 am to 5 pm. Makerspace and Newcomer Learning Centre will remain open. Floors 1-3 are available for study and workspaces. www.hpl.ca/central
The following locations have upcoming delayed openings due to Staff training drills.
Monday, October 20
Ancaster Branch, 10 am
Tuesday, October 21
Central Library, 10 am
Sherwood Branch, 10 am
Thursday, October 23
Locke Branch, 10am
Thursday, October 30
Parkdale Branch, 9:30am
You may visit nearby Branches for your library needs. www.hpl.ca/hours
Interlibrary Loan (ILLO) service will be temporarily paused starting Friday, September 26, due to continued negotiations between CUPW and Canada Post. We apologize for the inconvenience.
Bring back your borrowed library items (due Oct 1 or later) within 28 days to avoid a replacement or lost fee. We'll remove the fee when you bring back your overdue items.
Due to roof repair maintenance, the branch is temporarily closed until October 27. Please visit the Red Hill, Parkdale and Barton branches.
Red Hill Creek Expressway Books: 1997
Red Hill Creek Watershed Plan: surface water report
Regional Municipality of Hamilton-Wentworth
July 1997
CA3ONHWAO5 97 R233
Red Hill Creek Watershed Study: report on known and potential contaminant sources: draft for discussion
Regional Municipality of Hamilton-Wentworth
July 10, 1997
CA3ONHWAO5 97 R263D
Red Hill Creek Watershed Plan: Water Quality Report
Regional Municipality of Hamilton-Wentworth
August 1997
CA3ONHWAO5 97 R232
Canadian Environmental Assessment Agency: ministerial guidelines: Canadian Environmental Assessment Act, s.58(1)(a): procedures for an assessment by a review panel
Red Hill Creek Expressway Review Panel
November 1997
CA1EA99 RM4
Red Hill Creek Watershed Study: Report on Known and Potential Contaminant Sources
Regional Municipality of Hamilton-Wentworth
December 11, 1997
CA3ONHWAO5 97 R236
Alive and well [video-recording]: a report on the Red Hill Valley Environmental Rehabilitation Project
CSW Productions
1997
R333.7209713 ALI (2nd floor)
A fluvial geomorphologic assessment of Red Hill Creek and its tributaries
Regional Municipality of Hamilton-Wentworth. Special Projects Office
1997?
R551.4420971352 FLU CESH
CA3ONHWAO5 97 R43
Red Hill Creek Expressway: North South Section: Community Stakeholders Committee
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 C57
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing air quality draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R241D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing fisheries draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R239D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing hydrogeological conditions draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R240D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing noise draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R243D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing surface water and water quality draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 F242D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing terrestrial resources draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R238D
Red Hill Creek Expressway North-South Section: Impact Assessment and Design Process: Visual Assessment - Escarpment Crossing Baseline Inventory and Impact Predictions
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R232D
Red Hill Creek Expressway: North South section: Information Brief
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 I51
Red Hill Creek Watershed Plan: Cultural Heritage Resources Technical Report -- Draft Version
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R231D
The Red Hill Creek Watershed Plan: Cultural Heritage Resources Inventory: Technical Report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R231
Red Hill Creek watershed plan: hydrogeological inventory
Prepared for the Regional Municipality of Hamilton-Wentworth by Terraqua Investigations Ltd. in association with Blackport and Associates.
1997
R553.790971352 TER CESH
CA3ONHWAO5 97 R237
Red Hill Creek Watershed Plan Study: Soils and Geology
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R235
Red Hill Creek Watershed Plan: Surface Water Report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R233
Red Hill Creek Watershed Plan: Terrestrial Resources -- Phase One Background Inventory -- Draft Technical Report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R232D
Red Hill Creek Watershed Plan: Terrestrial Resources: Phase 1 background inventory: technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R232
Red Hill Creek Watershed Study: Fisheries -- Phase One: Background Inventory (Working Draft for Discussion)
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R234D
Red Hill Creek Watershed Study: Fisheries: Phase 1: background inventory
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R234
Soils and geology: Red Hill Creek watershed plan study
Regional Municipality of Hamilton-Wentworth. Special Projects Office
1997?
R551.700971352 SOI CESH
State of the Watershed report: Red Hill Creek Watershed Planning
Regional Municipality of Hamilton-Wentworth
1997
R333.70971352 STA CESH
Red Hill Creek Watershed Planning Process: first generation plan for discussion: second draft
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R244D