Starting the week of February 9, renovation preparations are underway in anticipation of the March 2 start. Computer availability may be limited, and the Living Room space is closed. Renovations are expected to wrap up by late Spring. Thank you for your patience.
Renovation preparations are underway in anticipation of the March 2 start. Starting the week of February 23, the 2nd Floor will be closed. The Children's collection will be temporarily available on the 1st Floor. Renovations are expected to wrap up by late Spring. Thank you for your patience.
All HPL Branches are closed on Family Day, Monday, February 16. Bookmobile is off the Road. Extended Access and Study Hall is not available. Regular service hours resume on Tuesday, February 17.
Starting Tuesday, February 10, the First Floor Living Room will be unavailable due to renovation preparations. Study and work spaces are available on Floors 2-3.
Please note the Noon Hour Concert on Friday, February 13, will be held at Terryberry Branch instead.
Thank you for your patience.
Please note the following Bookmobile visit updates.
Tuesday, February 10
McMaster University will be 3:30-4 pm (instead of 3:30-4:30 pm
Greencedar will be 5-5:30 pm (instead of 4-5 pm)
Mountview will be 6-6:30 pm (instead of 5:30-6:30 pm)
Friday, February 13
Winona (11am-Noon) - Cancelled
Queen Victoria (3-4pm) - Cancelled
Family Day, Monday, February 16
Bookmobile is off the road.
Tuesday, February 17
McMaster University (3:30-4:30pm) - Cancelled
Thursday, February 19
Rockton (10:30am-11:30am) - Cancelled
Bennetto 5-5:30pm (instead of 4-5:30pm)
The accessible washroom at Carlisle Branch is not working. We aim to get it fixed quickly.
Effective Sunday, February 1, Sunday service hours at Central Library will be paused.
Sunday Hours will continue at Dundas, Red Hill, Terryberry, Turner Park, Valley Park and Waterdown Branches from 1-5pm.
Starting Monday, February 2, Central Library's daily hours will move back to a 9 am opening instead of 8 am, Monday through Saturday. Please make note of this new service change for your next visit. www.hpl.ca/hours
Mountain Steps
There were originally 7 sets of city-built stairs up the escarpment. The original locations were Chedoke Park, Dundurn Street, James Street, John Street, Ferguson Avenue, Wentworth Street, and Ottawa Street.
Currently there are 5 sets of stairs up the escarpment in addition to a privately-built set of steps. After the Jolley Cut was rebuilt, the John and Ferguson steps disappeared and their remnants were incorporated into the walkways at Sam Lawrence Park.
Chedoke
These steps connect the West Mountain to the lower west city, coming close to the front door of the Chedoke Civic Golf Course clubhouse. There are 289 steps.
Dundurn
The original Dundurn wooden steps were replaced in the 1990s by steel steps. There are 326 steps.
James
The original James Street wooden steps were replaced in 1987. The stairs originate at Southam Park on the mountain at the top of the Claremont Access. There are 227 steps.
Wentworth
The original wooden steps built in 1903 consisted of 6” to 7 ¼” risers. The stringers rested on cedar posts sunk 4-7’ in the ground. The original staircase had 570 steps. After a rock slide in March of 1983 they were replaced with metal steps just east of the position of the original steps and they now follow the path of the old East End Incline Railway. There are 498 steps.
Kenilworth
The Kenilworth steps connect the East Mountain to the Escarpment Rail Trail/Bruce Trail, and continue down to the Rosedale area of Hamilton. There are 228 steps.
Before the city completed construction on the Kenilworth stairs, a privately built set of steps named Uli’s Steps connected the upper and lower city. These steps were built as a retirement project by a Hamiltonian named Uli who spent two years on the project. They have 305 steps.







