Due to scheduled maintenance, public computers at Study Hall locations (Dundas, Red Hill, Terryberry, Turner Park, Valley Park and Waterdown) will be unavailable beginning at 9:00 PM this evening. The work is expected to be completed by midnight.
Please note that there is higher than usual noise levels and odors due to renovations taking place this week. Thank you in advance for your patience.
The accessible washroom on the 1st floor at Terryberry Branch is not working. We aim to get it fixed quickly.
The Seasonal Affective Disorder therapy lamp on the 2nd floor at Central Library is out of order. The estimated time of disruption is unknown at this time. For more locations, please visit Light Therapy Lamps | HPL.
Starting March 30, renovations for the 2nd floor Central Children's Area will begin. Programs will still be offered as scheduled and there will be a temporary pop-up Children’s Area on the northeast side of the 2nd floor (near the Piano Room), including access to collections and train tables. Thank you for your patience during this time.
Due to driver availability, Bookmobile is off the road for the following. We apologize for the inconvenience.
Wednesday, April 15
- Swansea 10:00-10:30 am - Cancelled
- Helen Detwiler 11am-Noon - Cancelled
- Warplane Museum 3-4 pm - Cancelled
Thursday, April 16
- Rockton 10:30-11:30 am - Cancelled
- Mohawk Gardens 2:30-3 pm - Cancelled
- Meadowlands 3:30-4 pm - Cancelled
Tuesday, April 21
- Greencedar 5:30pm-6:30pm (instead of 4-5pm)
- Mountview 5:30-6:30 pm - Cancelled
Friday, April 24
- Winona 11 am-Noon - Cancelled
- Maplewood 2:30-4 pm - Cancelled
Tuesday, April 28
- McMaster 3:30-4:30 pm - Cancelled
Wednesday, April 29
- Swansea 10-10:30 am - Cancelled
- Helen Detwiler 11 am-Noon - Cancelled
- Warplane Museum 3-4 pm - Cancelled
Starting Monday, March 16, adults 18+ are required to show their Library card to access Central Library. This is a temporary measure to ensure safety for all. Thank you for your patience in advance.
From March 23 until April 12, Valley Park Community Centre will be closed for renovations, reopening April 13. Pool and changerooms will remain closed until early summer 2026.
Valley Park Branch will remain open during the renovations for your library needs.
As of Monday, March 2, Concession Branch's Living Room and Makerspace areas are closed. (The next nearest Makerspaces are Sherwood and Terryberry Branches.) Seating may be limited at times. Renovations are expected to be completed in late Spring. Thank you for your patience.
As of Monday, March 2, Sherwood Branch's 2nd floor is closed due to renovations. Makerspace, Children and Teen's collection are temporarily available on the 1st floor. All programs will be held in the basement program room. Renovations are expected to be completed in late Spring. Thank you for your patience.
The accessible washroom at Carlisle Branch is not working. We aim to get it fixed quickly.
History of Gore Park

Other things were happening to the park during the 1950s besides the bird menace. The old fountain installed for the Royal visit in 1860 was finally condemned as unsafe and removed to make way for the three saucer shaped fountains donated by the Kinsmen (48). The flagpole, having been condemned as unsafe, was replaced by a steel one donated to the city by Dofasco.
The 1960s got off to a roaring start with the dedication of the new $20,000 fountains. Prime Minister Diefenbaker was scheduled to come to the ceremony but a blizzard kept him grounded in Ottawa. The Honourable Ellen Fairclough stood in his place (49). During this time period it was decided that Gore Park needed a master plan for a complete change. The Parks Board decided to set up a permanent committee to look into the question. Five committees, four reports and five years after talks commenced in 1962 they were no closer to any acceptable designs for renovation than they had been at the beginning.

The Parks Board presented their latest proposal in April 1968. It called for replacing the Kinsmen's fountain with a 150 foot long reflecting pool with three spray fountains, planting more flowers, closing Hughson Street through the park and putting a steel picket fence around the park. The final version of that report, presented 12 months later, left Hughson Street open but retained all the other suggestions. The only problem now facing the Board was the fact that there was absolutely no money to do anything proposed. They hoped the money would be available in two years time (50).

The renovations were finally budgeted for and slated to start in the summer of 1970. The central focus of the new park would be the new fountain. It was to be an oval with a twenty-five foot spray in the middle and about 25 other smaller jets around it. All benches were to be removed and seats without backs placed at intervals. $135,000 was budgeted for the renovations (51). The fountain was officially turned on October 23, 1970 and worked beautifully. The coloured lights playing on it made quite an impressive sight.