The accessibility door at Carlisle Branch is not working. We aim to fix it quickly.
Due to exterior pavement construction, the Study Hall (8pm-Midnight) on Thursday, April 16 is cancelled. Study Hall service resumes on Monday, April 20.
The back parking lot will not be accessible from 10 pm on April 16 to 10 pm on Friday, April 17. Thank you for your understanding.
Please note that there is higher than usual noise levels and odors due to renovations taking place this week. Thank you in advance for your patience.
The accessible washroom on the 1st floor at Terryberry Branch is not working. We aim to get it fixed quickly.
Due to Staff training, Mount Hope Branch will have a delayed opening of 2 pm on Monday, May 4. You may visit Turner Park Branch as the next nearest location for your library needs. Thank you for your patience.
The Seasonal Affective Disorder therapy lamp on the 2nd floor at Central Library is out of order. The estimated time of disruption is unknown at this time. For more locations, please visit Light Therapy Lamps | HPL.
Starting March 30, renovations for the 2nd floor Central Children's Area will begin. Programs will still be offered as scheduled and there will be a temporary pop-up Children’s Area on the northeast side of the 2nd floor (near the Piano Room), including access to collections and train tables. Thank you for your patience during this time.
Due to driver availability, Bookmobile is off the road for the following. We apologize for the inconvenience.
Wednesday, April 15
- Swansea 10:00-10:30 am - Cancelled
- Helen Detwiler 11am-Noon - Cancelled
- Warplane Museum 3-4 pm - Cancelled
Thursday, April 16
- Rockton 10:30-11:30 am - Cancelled
- Mohawk Gardens 2:30-3 pm - Cancelled
- Meadowlands 3:30-4 pm - Cancelled
Tuesday, April 21
- Greencedar 5:30pm-6:30pm (instead of 4-5pm)
- Mountview 5:30-6:30 pm - Cancelled
Friday, April 24
- Winona 11 am-Noon - Cancelled
- Maplewood 2:30-4 pm - Cancelled
Tuesday, April 28
- McMaster 3:30-4:30 pm - Cancelled
Wednesday, April 29
- Swansea 10-10:30 am - Cancelled
- Helen Detwiler 11 am-Noon - Cancelled
- Warplane Museum 3-4 pm - Cancelled
Starting Monday, March 16, adults 18+ are required to show their Library card to access Central Library. This is a temporary measure to ensure safety for all. Thank you for your patience in advance.
From March 23 until April 12, Valley Park Community Centre will be closed for renovations, reopening April 13. Pool and changerooms will remain closed until early summer 2026.
Valley Park Branch will remain open during the renovations for your library needs.
As of Monday, March 2, Concession Branch's Living Room and Makerspace areas are closed. (The next nearest Makerspaces are Sherwood and Terryberry Branches.) Seating may be limited at times. Renovations are expected to be completed in late Spring. Thank you for your patience.
As of Monday, March 2, Sherwood Branch's 2nd floor is closed due to renovations. Makerspace, Children and Teen's collection are temporarily available on the 1st floor. All programs will be held in the basement program room. Renovations are expected to be completed in late Spring. Thank you for your patience.
The accessible washroom at Carlisle Branch is not working. We aim to get it fixed quickly.
Red Hill Creek Expressway Books: 1984
Red Hill Expressway Hearings. Background Reports. Report on Corporate Site Selection Study
Prepared by Professor Ken Bowlby, King's College
Note: Hamilton Analysis Section begins after page 50
March 1984
CA3ONHWAO5 84 B169
In the Matter of Sections 2, 3 and 6(3) of The consolidated Hearings Act, (S.O. 1981, c20); and In the Matter of Sections 12(2) and 12(3) of The Environmental Assessment Act, (R.S.O. 1980, c. 140); and In the Matter of Section 17(3) of The Planning Act, (R.S.O. 1980, c.379); and In the Matter of a reference to the Ontario Municipal Board by the Honourable Claude F. Bennett, Minister of Municipal Affairs and Housing, on a request by John F. Ellis, on behalf of The Save the Valley Committee, to amend the Official Plan for the Hamilton Wentworth Planning Area, which would have the effect of deleting references to the proposed East-West, North-South Transportation Facility from the said plan (O.M.B. File No. J82-007 - Minister's File No. 25-OP-0056). and In the Matter of Sections 24, 25 and 26 of The Niagara Escarpment Planning and Development Act, (R.S.O. 1980, c.316); and In the Matter of Section 28(3) of The Conservation Authorities Act, (R.S.O. 1980, c.85); and In the Matter of Section 64 of The Ontario Municipal Board Act, (R.S.O., c.347); and In the Matter of an undertaking of the Regional Municipality of Hamilton-Wentworth to develop and construct the Mountain East-West and North-South Transportation corridor to connect Highway 403 in Ancaster to the Queen Elizabeth Way in the eastern portion of the City of Hamilton
Consolidated Hearings Board
Vol. 1 (Oct. 15/84), 2 (Oct. 16/84), 3 (Oct. 22/84), 4 (Oct. 23/84), 5 (Oct. 24/84), 6 (Oct. 25/84), 7 (Oct. 29/84), 8 (Oct. 30/84), 9 (Oct. 31/84), 10 (Nov. 1/84), 11 (Nov. 5/84), 12 (Nov. 7/84), 13 (Nov. 8/84), 14 (Nov. 19/84), 15 (Nov. 20/84), 16 (Nov. 21/84), 17 (Nov. 22/84), 18 (Nov. 26/84), 19 (Nov. 27/84), 20 (Nov. 28/84), 21 (Nov. 29/84), 22 (Dec. 3/84), 23 (Dec. 4/84), 24 (Dec. 5/84), 25 (Dec. 6/84), 26 (Dec. 10/84), 27 (Dec. 11/84), 28 (Dec. 12/84), 29 (Dec. 13/84), 30 (Dec. 17/84), 31 (Dec. 18/84), 32 (Dec. 19/84), 33 (Dec. 20/84), 34 (Jan. 7/85), 35 (Jan. 8/85), 36 (Jan. 10/85), 37 (Jan. 14/85), 38 (Jan. 15/85), 39 (Jan. 16/85), 40 (Jan. 21/85), 41 (Jan. 22/85), 42 (Jan. 23/85), 43 (Jan. 24/85), 44 (Jan. 30/85), 45 (Jan. 31/85), 46 (Feb. 4/85), 47 (Feb. 5/85), 48 (Feb. 6/85), 49 (Feb. 11/85), 50 (Feb. 12/85), 51 (Feb. 18/85), 52 (Feb. 19/85), 53 (Feb. 20/85), 54 (Feb. 20/85: evening) 55 (Feb. 21/85), 56 (Feb. 25/85), 57 (Feb. 27/85), 58 (Feb. 28/85), 59 (March 6/85), 60 (March 7/85), 61 (March 8/85), 62 (March 11/85), 63 (March 12/85), 64 (March 13/85), 65 (March 18/85), 66 (March 19/85), 67 (March 20/85), 68 (March 25/85), 69 (March 26/85), 70 (March 27/85), 71 (March 28/85), 72 (April 1/85), 73 (April 2/85), 74 (April 3/85), 75 (April 4/85), 76 (April 9/85), 77 (April 10/85), 78 (April 11/85), 79 (April 12/85), 80 (April 15/85), 81 (April 16/85), 82 (April 29/85), 83 (April 30/85), 84 (May 1/85), 85 (May2/85), 86 (May 3/85), 87 (May 6/85), 88 (May 13/85), 89 (May 14/85), 90 (May 15/85), 91 (May 16/85), 92 (June 10/85), 93 (June 11/85), 94 (June 12/85), 95 (June 13/85), 96 (June 14/85), 97 (June 17/85), 98 (June 18/85), 99 (June 19/85), 100 (June 20/85)
CA3ONHWAO5 84 T63
[Minutes of the Joint Board Hearings. The Spectator articles relating to these hearings are in volume 6 of the Roads in Hamilton Scrapbook (R917.1351 R531 CESH ). To see the minutes relating to a particular day mentioned in the articles, refer to the volume number for that day as listed above.]
In the Matter of an Undertaking of the Regional Municipality of Hamilton-Wentworth to develop and construct the Mountain East-West and North-South Transportation corridor to connect Highway 403 in Ancaster to the Queen Elizabeth Way in the eastern portion of the City of Hamilton. Witness Statements
Osler, Hoskin and Harcourt. On Behalf of the Applicant, the Regional Municipality of Hamilton-Wentworth
September 4, 1984
CA3ONHWAO5 84 W37
Region of Hamilton-Wentworth. Regional Economic Development and the Proposed East-West and North-South Transportation Corridor
Currie, Cooper & Lybrand Management Consultants
September 25, 1984
R388.40971352 REG CESH
In the Matter of an undertaking of the Regional Municipality of Hamilton-Wentworth to develop and construct the Mountain East-West and North-South Transportation corridor to connect Highway 403 in Ancaster to the Queen Elizabeth Way in the eastern portion of the City of Hamilton. Witness Statement of Leonard Dutchak
Osler, Hoskin & Harcourt. On behalf of the Applicant, the Regional Municipality of Hamilton-Wentworth
September 27, 1984
CA3ONHWAO5 84 W37L
A Review of the Mountain East West and North South Transportation Corridor Environmental Assessment Submission
Social Planning and Research Council
October 1984
R388.40971352 REV CESH
Assessment of the Region's Capability to Finance Its Share of the E-W/N-S Transportation Corridor
Regional Municipality of Hamilton-Wentworth. Department of Finance
1984
CA3ONHWAO5 84 A76
Background Reports Red-Hill Expressway Consolidated Hearings: Effect of road Traffic Noise on House Prices
Regional Municipality of Hamilton-Wentworth
1984
CA3ONHWAO5 84 B164
Background Reports Red Hill Expressway Consolidated Hearings - NRC Report Procedures for Estimating Highway User Cost Air Pollution and Noise Effects. National Cooperative Highway Research Program Report 133. Procedures for Estimating Highway User Costs, Air Pollution, and Noise Effects.
Highway Research Board. National Research Council. National Academy of Sciences - National Academy of Engineering.
[1972] 1984
CA3ONHWAO5 84 B162
Transcripts of Consolidated Hearings Board Preliminary Hearing: Mountain East-West and North-South Transportation Corridor
Regional Municipality of Hamilton-Wentworth
1984
CA3ONHWAO5 84 T61
Monitoring Report on the Upper Ottawa Street Landfill Site
Department of Engineering. Regional Municipality of Hamilton-Wentworth
1984/1986 - (Annual)
CA3ONHWQ90 M56







