Red Hill Creek Expressway
There are many sources for the history of the Red Hill Creek Expressway described here, spanning nearly a century.
SCRAPBOOKS
There are two scrapbooks with newspaper clippings (primarily from the Hamilton Spectator) concerning the planning and the controversy over the Red Hill Creek Expressway.
Clippings before August 1987 are in:
Roads in Hamilton Scrapbook
Vol. [1], [3], 4, 5, 6, 7
R917.1351 R531 CESH
Clippings after August 1987 are in:
Red Hill Creek Expressway Scrapbook
Vol. 1+
R388.40971352 RED CESH
PAMPHLETS
CF - Hamilton - Roads - Red Hill Creek Expressway
Miscellaneous pamphlets relating to the planning
ARCHIVES
There is an Archives File of secondary documentation collected by the Save the Valley Committee
Save the Valley Committee Fonds
Finding Aid
R333.7209713 HOU CESH
BOOKS AND REPORTS (by date)
Red Hill Creek Expressway Books: 1917-1950
Reconnaissance Report on Development of Hamilton, Ontario
Noulan Cauchon
October 1917
R917.1351 C31 CESH
Report on Mountain Highways of Hamilton, Ontario
Noulan Cauchon
1919
R917.1351 C31r CESH
Major Street System for the City of Hamilton. A Report by Norman D. Wilson and A.E.K. Bunnell to the City Planning Board of Hamilton
Hamilton Planning Board
November 1950
R711.7 W695 CESH
Red Hill Creek Expressway Books: 1960-1969
Hamilton Area Transportation Plan Summary Report
Department of Public Works. Hamilton, Ont.
1963
R388.40971352 H183h CESH
Background Reports - Red Hill Expressway Consolidated Hearings. National Cooperative Highway Research Program Report 78 Highway noise. Measurement, Simulation , and Mixed Reactions.
William J. Galloway, Welden E. Clark, and Jean S. Kerrick. Bolt Beranek and Newman Highway Research Board. Division of Engineering. National Research Council. National Academy of Sciences - National Academy of Engineering.
1969
R388.40971352 GAL CESH
Red Hill Creek Expressway Books: 1970-1975
Background Reports Red Hill Expressway Consolidated Hearing - Record Number 390 Geometric Design Implications and Vehicle Noise
Highway Research Board. National Research council. National Academy of Sciences. National Academy of Engineering.
[1972]
CA3ONHWAO5 84 B163
Hamilton Mountain and Redhill Creek Transportation Corridor: Submission respecting Mountain Section
Hamilton, Ontario. Board of Control
1972
CA4ONHBLA15 72 H15
Submission by the City of Hamilton Board of Control Respecting the Mountain Section Hamilton Mountain and Red Hill Creek Transportation Corridor
Hamilton, Ontario. Board of Control
1972
CA4ONBLA15 72 S73
Trucks in the City of Hamilton. Hamilton Truck Origin and Destination Study. A Report on the Study and Analysis of Existing Truck Movements in the City of Hamilton
Prepared for the Transportation and Traffic Committee of the City of Hamilton by the Department of Traffic and the Ontario Ministry of Transportation and Communications
July 1973
R388.41324 HAM CESH
Technical Report Proposed Red Hill Creek Expressway
Hamilton Region Conservation Authority
1973
CA2ONER59 73 T26
Red Hill Creek Expressway Review. An analysis of alternative solutions. prepared for the city-provincial technical advisory committee
Route Projects Planning Office, Ministry of Transportation and Communications
Prepared by: S.C.J. Radbone
January 1975
R388.40971352 RED CESH
CA2ONDT 75 R23
Report on Redhill Creek Flood Plain Mapping for the Hamilton Regional Conservation Authority
N.M. Dillon Ltd.
March 1975
R627.40971352 REP CESH
Redhill Creek. Watershed Management Study
Hamilton Region Conservation Authority
M.M. Dillon Ltd.
June 1975
R627.40971352 RED CESH
Red Hill Creek Expressway Review: an Analysis of Alternative Solutions
Ontario. Ministry of Transportation and Communications
1975
CA2ONDT 75 R23
Regional roads study: progress report No. 2
Regional Roads Coordinating Committee
1975
R388.40971352 REG CESH
Red Hill Creek Expressway Books: 1976-1979
Study Design Report. Mountain East-West and North South Corridors System Analysis, Route Creation and Functional Planning Study
Deleus Cather, Canada Ltd.
February 1978
R388.40971352 STU CESH
Mountain East-West and North-South Corridor Study. Phase 1 - Future Road Needs - Data Collection
The Regional Municipality of Hamilton-Wentworth
July 1978
R388.40971352 HAM CESH Vol. 1
Background Reports Red Hill Expressway Consolidated Hearings - Housing Type and Tenure Effects on Reactions to Road Traffic Noise
S.M. Taylor, S. Birnie, and F.L. Hall
Department of Geography and Department of Civil Engineering, McMaster University, Hamilton, Ontario, Canada
Environment and Planning A, volume 10, pages 1377-1386
1978
CA3ONHWAO5 84 B1637
The effects of the Upper Ottawa street landfill on Redhill Creek
Ontario. Water Resources Assessment. Technical Support
Ministry of the Environment
1978
R628.1686713 On8 CESH
Mountain East-West and North-South Corridor Study. Phase 2 - Preliminary Evaluation of Alternatives. Report 2 of 4
The Regional Municipality of Hamilton-Wentworth
January 1979
R388.40971352 HAM Vol. 2 CESH
Floodplain Analysis Red Hill Creek Valley
March 1979
R627.40971352 FLO CESH
Mountain East-West and North-South Corridor Study. Information Package. Phase 3 - Detailed Evaluation
May 1979
R388.40971352 HAM Vol. 3 CESH
Mountain east-west and north-south corridor study: supplementary documentation: environmental assessment submission
Regional Engineering Dept.
1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study Summary Report. - The Need - The Alternatives - The Recommended Facility
July 1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study. Response to Public Briefs Presented to Regional Council
July 18, 1979
R388.40971352 MOU CESH
Mountain East-West and North-South Corridor Study. Phase 3 - Detailed Impact Assessment and Evaluation. Report 3 of 4
The Regional Municipality of Hamilton-Wentworth
August 1979
R388.40971352 HAM Vol. 3 CESH
Mountain East-West and North-South corridor Study, Phase 3: Evaluation of Viable Alternatives
Hamilton-Wentworth Regional Municipal Council
1979
CA3ONHWAO5 79 M52
Red Hill Creek Expressway review: an analysis of alternative solutions: prepared for the city-provincial technical advisory committee
Ministry of Transportation and Communications
1979
R388.40971352 RED CESH
Red Hill Creek Expressway Books: 1980-1981
Mountain East-West and North-South Corridor Study. Phase IV
Prepared for Delcan. Ltd.
Project H3236-G
May 30, 1980
R388.40971352 NOR CESH
Archaeological Survey and Heritage Resource Assessment. East-West/North-South Transportation Corridor. East Hamilton
DeLCan. DeLeuw, Cather, Canada. Ltd.
June 1980
R388.40971352 ARC CESH
Noise Impact Assessment regarding Mountain East-West and North-South Transportation Corridor
Regional Municipality of Hamilton-Wentworth
Prepared for Delcan by Valcoustics Canada Ltd.
October 1980
R388.40971352 NOI CESH
Geotechnical Investigation Proposed Red Hill Creek Freeway Escarpment Crossing Mount Albion Road, Hamilton, Ontario
Prepared for Delcan Ltd., Project H3402-G
November 27, 1980
R388.40971352 GEO CESH
The Red Hill Creek Issue
Glen Eker
University of Windsor
1980
R363.700971352 EKE CESH
Red Hill Creek Valley - Proposed Recreation Master Plan
Regional Municipality of Hamilton-Wentworth.
Ecologistics Ltd.
January 1981
R352.94580971 RED CESH
Mountain East-West and North-South Corridor Study. Phase 4 - Functional Planning of Preferred Option. Report 4 of 4
September 1981
R388.40971352 HAM Vol. 4 CESH
Background Reports Red Hill Expressway Consolidated Hearing - Direct Comparison of Community Response to Road Traffic Noise and the Aircraft Noise
Fred L. Hall, Susan E. Birnie, S. Martin Taylor and John E. Palmer
Department of Civil Engineering and Department of Geography, McMaster University, Hamilton, Ontario Canada.
Journal of the Acoustical Society of America 70(6)
December 1981
CA3ONHWAO5 84 B167
Red Hill Creek Expressway Books: 1982-1983
Background Reports Red Hill Expressway Consolidated Hearings - Factors Affecting Response to Road Noise
S.M. Taylor and F.L. Hall
Department of Geography and Department of Civil Engineering, McMaster University, Hamilton, Ontario, Canada
Environment and Planning A, volume 9, pages 585-597
CA3ONHWAO5 84 B166
Red Hill Creek Valley Recreation Plan. Red Hill Creek Land Use Potential. A Plan of Cultural, Social and Recreational Uses in the Red Hill Creek Valley
September 1982
CA4ONHBLZ65 82 R23
Background Reports Red Hill Expressway Consolidated Hearings - Reliability of Social Survey Data on Noise Effects
Fred L. Hall and S. Martin Taylor Department of Geography and Department of Civil Engineering, McMaster University, Hamilton, Ontario, Canada
Journal of the Acoustical Society of America 72(4)
October 1982
CA3ONHWAO5 84 B168
Mountain East-West and North-South Transportation Corridor. Vol. 1. Environmental Assessment Submission
Regional Municipality of Hamilton-Wentworth
December 1982
R388.40971352 MOU Vol. 1 CESH
Mountain East-West and North-South Transportation Corridor. Vol. II - Exhibits
Environmental Assessment Submission
December 1982
R388.40971352 MOU Vol. 2 CESH
Mountain East-West and North-South Transportation Corridor. Revised Travel Forecast
1982
R388.40971352 MOU CESH
Review Under the Environmental Assessment Act prepared by Ministries and Agencies of the Province of Ontario. Mountain East-West and North-South Transportation Corridor Environmental Assessment
EA File No. 1-81-0021-000
Submitted by: The Regional Municipality of Hamilton-Wentworth
August 1983
R388.40971352 REV CESH
Mountain East-West and North-South Transportation Corridor. Supplementary Documentation. Environmental Assessment Submission
Regional Municipality of Hamilton-Wentworth
November 1983
R388.40971352 MOU Vol. 2 CESH
Comments by Government Reviewers: Environmental Assessment Submission Mountain East West and North South Transportation Corridor
Hamilton-Wentworth Regional Municipality Council
1983
CA3ONHWAO5 83 C53
Effect of Proposed North-South Expressway on Peak Flood Flows and Levels in Lower Red-Hill Creek
Department of Engineering. Hamilton-Wentworth Regional Municipality.
1983
CA3ONHWQ90 83 E26
Effects of the Upper Ottawa Street Landfill on Redhill Creek: Interim Report Upper Ottawa Street Landfill Study Reference Paper 14
Upper Ottawa Street Landfill Site Study Committee. Regional Municipality of Hamilton-Wentworth
1983
CA3ONHWQ90 83 I56R14
Red Hill Creek Expressway Books: 1984
Red Hill Expressway Hearings. Background Reports. Report on Corporate Site Selection Study
Prepared by Professor Ken Bowlby, King's College
Note: Hamilton Analysis Section begins after page 50
March 1984
CA3ONHWAO5 84 B169
In the Matter of Sections 2, 3 and 6(3) of The consolidated Hearings Act, (S.O. 1981, c20); and In the Matter of Sections 12(2) and 12(3) of The Environmental Assessment Act, (R.S.O. 1980, c. 140); and In the Matter of Section 17(3) of The Planning Act, (R.S.O. 1980, c.379); and In the Matter of a reference to the Ontario Municipal Board by the Honourable Claude F. Bennett, Minister of Municipal Affairs and Housing, on a request by John F. Ellis, on behalf of The Save the Valley Committee, to amend the Official Plan for the Hamilton Wentworth Planning Area, which would have the effect of deleting references to the proposed East-West, North-South Transportation Facility from the said plan (O.M.B. File No. J82-007 - Minister's File No. 25-OP-0056). and In the Matter of Sections 24, 25 and 26 of The Niagara Escarpment Planning and Development Act, (R.S.O. 1980, c.316); and In the Matter of Section 28(3) of The Conservation Authorities Act, (R.S.O. 1980, c.85); and In the Matter of Section 64 of The Ontario Municipal Board Act, (R.S.O., c.347); and In the Matter of an undertaking of the Regional Municipality of Hamilton-Wentworth to develop and construct the Mountain East-West and North-South Transportation corridor to connect Highway 403 in Ancaster to the Queen Elizabeth Way in the eastern portion of the City of Hamilton
Consolidated Hearings Board
Vol. 1 (Oct. 15/84), 2 (Oct. 16/84), 3 (Oct. 22/84), 4 (Oct. 23/84), 5 (Oct. 24/84), 6 (Oct. 25/84), 7 (Oct. 29/84), 8 (Oct. 30/84), 9 (Oct. 31/84), 10 (Nov. 1/84), 11 (Nov. 5/84), 12 (Nov. 7/84), 13 (Nov. 8/84), 14 (Nov. 19/84), 15 (Nov. 20/84), 16 (Nov. 21/84), 17 (Nov. 22/84), 18 (Nov. 26/84), 19 (Nov. 27/84), 20 (Nov. 28/84), 21 (Nov. 29/84), 22 (Dec. 3/84), 23 (Dec. 4/84), 24 (Dec. 5/84), 25 (Dec. 6/84), 26 (Dec. 10/84), 27 (Dec. 11/84), 28 (Dec. 12/84), 29 (Dec. 13/84), 30 (Dec. 17/84), 31 (Dec. 18/84), 32 (Dec. 19/84), 33 (Dec. 20/84), 34 (Jan. 7/85), 35 (Jan. 8/85), 36 (Jan. 10/85), 37 (Jan. 14/85), 38 (Jan. 15/85), 39 (Jan. 16/85), 40 (Jan. 21/85), 41 (Jan. 22/85), 42 (Jan. 23/85), 43 (Jan. 24/85), 44 (Jan. 30/85), 45 (Jan. 31/85), 46 (Feb. 4/85), 47 (Feb. 5/85), 48 (Feb. 6/85), 49 (Feb. 11/85), 50 (Feb. 12/85), 51 (Feb. 18/85), 52 (Feb. 19/85), 53 (Feb. 20/85), 54 (Feb. 20/85: evening) 55 (Feb. 21/85), 56 (Feb. 25/85), 57 (Feb. 27/85), 58 (Feb. 28/85), 59 (March 6/85), 60 (March 7/85), 61 (March 8/85), 62 (March 11/85), 63 (March 12/85), 64 (March 13/85), 65 (March 18/85), 66 (March 19/85), 67 (March 20/85), 68 (March 25/85), 69 (March 26/85), 70 (March 27/85), 71 (March 28/85), 72 (April 1/85), 73 (April 2/85), 74 (April 3/85), 75 (April 4/85), 76 (April 9/85), 77 (April 10/85), 78 (April 11/85), 79 (April 12/85), 80 (April 15/85), 81 (April 16/85), 82 (April 29/85), 83 (April 30/85), 84 (May 1/85), 85 (May2/85), 86 (May 3/85), 87 (May 6/85), 88 (May 13/85), 89 (May 14/85), 90 (May 15/85), 91 (May 16/85), 92 (June 10/85), 93 (June 11/85), 94 (June 12/85), 95 (June 13/85), 96 (June 14/85), 97 (June 17/85), 98 (June 18/85), 99 (June 19/85), 100 (June 20/85)
CA3ONHWAO5 84 T63
[Minutes of the Joint Board Hearings. The Spectator articles relating to these hearings are in volume 6 of the Roads in Hamilton Scrapbook (R917.1351 R531 CESH ). To see the minutes relating to a particular day mentioned in the articles, refer to the volume number for that day as listed above.]
In the Matter of an Undertaking of the Regional Municipality of Hamilton-Wentworth to develop and construct the Mountain East-West and North-South Transportation corridor to connect Highway 403 in Ancaster to the Queen Elizabeth Way in the eastern portion of the City of Hamilton. Witness Statements
Osler, Hoskin and Harcourt. On Behalf of the Applicant, the Regional Municipality of Hamilton-Wentworth
September 4, 1984
CA3ONHWAO5 84 W37
Region of Hamilton-Wentworth. Regional Economic Development and the Proposed East-West and North-South Transportation Corridor
Currie, Cooper & Lybrand Management Consultants
September 25, 1984
R388.40971352 REG CESH
In the Matter of an undertaking of the Regional Municipality of Hamilton-Wentworth to develop and construct the Mountain East-West and North-South Transportation corridor to connect Highway 403 in Ancaster to the Queen Elizabeth Way in the eastern portion of the City of Hamilton. Witness Statement of Leonard Dutchak
Osler, Hoskin & Harcourt. On behalf of the Applicant, the Regional Municipality of Hamilton-Wentworth
September 27, 1984
CA3ONHWAO5 84 W37L
A Review of the Mountain East West and North South Transportation Corridor Environmental Assessment Submission
Social Planning and Research Council
October 1984
R388.40971352 REV CESH
Assessment of the Region's Capability to Finance Its Share of the E-W/N-S Transportation Corridor
Regional Municipality of Hamilton-Wentworth. Department of Finance
1984
CA3ONHWAO5 84 A76
Background Reports Red-Hill Expressway Consolidated Hearings: Effect of road Traffic Noise on House Prices
Regional Municipality of Hamilton-Wentworth
1984
CA3ONHWAO5 84 B164
Background Reports Red Hill Expressway Consolidated Hearings - NRC Report Procedures for Estimating Highway User Cost Air Pollution and Noise Effects. National Cooperative Highway Research Program Report 133. Procedures for Estimating Highway User Costs, Air Pollution, and Noise Effects.
Highway Research Board. National Research Council. National Academy of Sciences - National Academy of Engineering.
[1972] 1984
CA3ONHWAO5 84 B162
Transcripts of Consolidated Hearings Board Preliminary Hearing: Mountain East-West and North-South Transportation Corridor
Regional Municipality of Hamilton-Wentworth
1984
CA3ONHWAO5 84 T61
Monitoring Report on the Upper Ottawa Street Landfill Site
Department of Engineering. Regional Municipality of Hamilton-Wentworth
1984/1986 - (Annual)
CA3ONHWQ90 M56
Red Hill Creek Expressway Books: 1985
Report No. 46-20580. Mountain East-West and North-South Transportation Corridor - Air Quality Aspects for Regional Municipality of Hamilton Wentworth Department of Engineering
S.C. Barton, M. Dobson, Environmental and Chemical Engineering Division, Sheridan Park Research Community
[March 1985]
CA3ONHWQ90 85 M52
In the matter of an undertaking of the Regional Municipality of Hamilton-Wentworth to develop and construct the Mountain East-West and North-South Transportation corridor to connect Highway 403 in Ancaster to the Queen Elizabeth Way in the eastern portion of the City of Hamilton; and ancillary matters related thereto. Before M.I. Jeffery, Q.C. Chairman (Dissenting), A.B. Ball, Member, M.D. Henderson, Member
October 24, 1985
CA3ONHWAO5 85 D24
Petition of the Save the Valley Committee - Red Hill Creek Expressway
November 20, 1985
R388.40971352 SAV CESH
Supplementary Submission of the Save the Valley Committee. To: The Lieutenant-Governor in Council
December 5, 1985
R388.40971352 SUP CESH
Appeal of Bob MacKenzie, M.P.P. Re: Joint Board Decision re: East/West North/South Freeway
1985
CA3ONHWAO5 85 A615
Hamilton and District Chamber of Commerce Response to Red Hill Creek Expressway Appeal
Regional Municipality of Hamilton-Wentworth
1985
CA3ONHWAO5 85 R262
Order in council and statement approved by cabinet regarding the Red Hill Expressway
Ontario. Executive Council
1985
R388.40971352 ONT CESH
CA3ONHWAO5 85 O67
Petition: Hamilton Region Conservation Authority - Red Hill Creek Expressway
Regional Municipality of Hamilton-Wentworth
1985
CA3ONHWAO5 85 P23
Petition of the Limeridge Road Property Owners Interest Group Inc.: Red Hill Creek Expressway
Limeridge Road Property Owners Interest Group Inc.
1985
R388.40971352 LIM CESH
Petition of the Save the Valley Committee: Red Hill Creek Expressway
Save the Valley Committee
1985
R388.40971352 SAV CESH
CA3ONWHAO5 85 P27
Replies to Petitions - Red Hill Creek Expressway Appeal
Hamilton Automobile Club
Pollution Probe
Sheila Copps, M.P.
Hamilton Construction Association
1985
CA3ONHWAO5 85 R266
Replies to the Petitions - Red Hill Creek Expressway
1. Resolution of the township of Glanbrook re: The Red Hill Creek Expressway
2. Position Paper - Mountain East-West and North-South Transportation Corridor presented by the Hamilton-Wentworth Economic Advisory Conference
3. Reply of the Centennial Parkway Ratepayers Group
4. Submission of the Hamilton Construction Association
5. Hamilton East Provincial Progressive Conservative Association
6. Response to Petitions by J. Buchanan
7. Response to Petitions by Cardinal Newman Parents Council
8. Response - Hamilton & District Home Builders Association
1985
CA3ONHWAO5 85 R26
Replies to the Petitions - Red Hill Creek Expressway
1. Hamilton and District Chamber of Commerce Reply to Red Hill Creek Expressway Appeal
2. Response to Red Hill Creek Expressway Appeal by E. Conway
3. Response to Red Hill Creek Expressway Appeal by Hamilton Harbour Commissioners
4. Response to Red Hill Creek Expressway Appeal by Metropolitan Hamilton Real Estate Board
5. Response of the Hamilton Trucking Council
6. Reply to the Red Hill Creek Expressway Appeal. V. Curtis
7. Reply to the Red Hill Creek Expressway Appeal of the Hamilton Automobile Club
8. Reply of the Ontario Land Corporation
1985
CA3ONHWAO5 85 R262
Replies to Petitions - Red Hill Expressway Appeal
1. Response to Red Hill Creek Expressway Appeal by the Ontario Ministry of Natural Resources
2. Response to Red Hill Creek Expressway Appeal by Robert M. Morrow, Mayor of Hamilton
3. Response to Red Hill Creek Expressway Appeal by Osler, Hoskin and Harcourt
4. Response to Red Hill Creek Expressway Appeal by the Hamilton and District Chamber of Commerce
1985
R388.40971352 REP Vol. 1, 2, 3 CESH
Replies to Petitions - Red Hill Creek Expressway Appeal
Response of Gordon Dean M.P.P. Wentworth
Response James Cimba
Response East Mountain Industrial Business Park
1985
CA3ONHWAO5 85 R265
Reply to the Petitions Opposing Hamilton Wentworth Expressways
Ika Enterprises & Developments (Balys Kronas)
1985
CA3ONHWAO5 85 R263
Response to the petitions of the Save the Valley Committee, The Hamilton Region Conservation Authority and the Limeridge Property Owners Interest Group Inc.: summary
Osler, Hoskin & Harcourt
[1985]
R388.40971352 RES CESH
Response to the petitions of the Save the Valley Committee, The Hamilton Regional Conservation Authority and the Limeridge Property Owners Interest Group Inc.
Osler, Hoskin & Harcourt
[1985?]
R388.40971352 RES CESH
Response of Gordon Dean MPP Red Hill Creek Expressway Appeal
Regional Municipality of Hamilton-Wentworth
1985
CA3ONHWAO5 85 R265
Supplementary submissions of the Save the Valley Committee
1985
R388.40971352 SUP CESH
Windermere Basin Sediment Study: Evaluation of Alternatives for a Cleanup of Windermere Basin - Final Report
Ontario. Ministry of the Environment
1985
CA2ONEV 85 W31
Consolidated Hearings Board Decision Red Hill Creek Freeway. October 24, 1985
In the matter of an undertaking of the Regional Municipality of Hamilton-Wentworth to develop and construct the Mountain East-West and North-South Transportation Corridor to connect Highway 403 in Ancaster to the Queen Elizabeth Way in the eastern portion of the City of Hamilton; and ancillary matter is related thereto.
Before M.I. Jeffery, Q.C. Chairman (Dissenting), A.B. Ball, member, M.D. Henderson, Member
October 24, 1985
Red Hill Creek Expressway Books: 1986-1989
Replies to Petitions - Red Hill Creek Expressway Appeal
1. Response to Red Hill Creek Expressway Appeal by Herman Turkstra to the Attorney-General of Ontario
2. Reply to Herman Turkstra's letter by the Attorney-General
3. Response to Red Hill Creek Expressway Appeal by Sheila Copps, M.P. to the Minister of Municipal Affairs of Ontario
4. Reply to Sheila Copps' letter by the Minister of Municipal Affairs
5. Response to Red Hill Creek Expressway Appeal by Helen L. Bell, Mayor, Township of Glanbrook
August 8 - September 19. 1986
R388.40971352 REP Vol. 2 CESH
Replies to Petitions - Red Hill Creek Expressway Appeal
1. Response to Red Hill Creek Expressway Appeal by Herman Turkstra to T.W. Lane, Solicitor, Ministry of the Attorney-General of Ontario
2. Response to Red Hill Creek Expressway Appeal by Herman Turkstra to David Peterson, Premier of Ontario
3. Response to Red Hill Creek Expressway Appeal by Thomas R. Lederer, Osler, Hoskin and Harcourt
November 3 - 7, 1986
R388.40971352 REP Vol. 3 CESH
Upper Ottawa Street Landfill Site Study: Executive Summary - Final Report
Regional Municipality of Hamilton-Wentworth. Upper Ottawa Street Landfill Site Study Committee
1986
CA3ONHWQ90 86 U65
Upper Ottawa Street Landfill Site Study: Final Report
Regional Municipality of Hamilton-Wentworth. Upper Ottawa Street Landfill Site Study Committee
1986
CA3ONHWQ90 86 U651
The Red Hill Creek Expressway project progress report
Regional Municipality of Hamilton-Wentworth. Roads Dept. Special Projects Office
198?
Periodical
Red Hill Creek Expressway Books: 1990-1996
Mountain East-West and North-South Transportation Corridor Project: Executive Summary Preliminary Design Investigation
Regional Municipality of Hamilton-Wentworth
1990
CA3ONHWAO5 90 M52
Red Hill Creek Expressway Project Progress Report
Regional Municipality of Hamilton-Wentworth. Dept. of Engineering
1990- (irregular)
CA3ONHWQ90 R23
Technical Report - The Red Hill Creek Four Lane Road
March 1994
[The Crombie Report]
R388.40971352 TEC CESH
CA3ONHWAO5 94 T26
Hamilton-Wentworth Plan
Ontario. Office of the Premier
1994
CA2ONPM 94 R22
Biological Inventory of the Red Hill Valley. prepared by the Hamilton Naturalist's Club
Hamilton Regional Conservation Authority
1995
R574.971352 BIO CESH
Red Hill Creek Expressway, North-South section: proposed assessment process
Regional Municipality of Hamilton-Wentworth, Transportation Dept.
February 1996
CA3ONHWL60 96 R23
Red Hill Creek Expressway. North-South section. Exemption order
Regional Municipality of Hamilton-Wentworth. Roads Dept., Transportation Group
May 1996
R388.40971352 RED CESH
CA3ONHWQ94 96 R23
Archaeological survey of the Redhill Creek Valley, City of Hamilton, Ontario
Mayer Heritage Consultants
1996
in cataloguing
Red Hill Creek Expressway Books: 1997
Red Hill Creek Watershed Plan: surface water report
Regional Municipality of Hamilton-Wentworth
July 1997
CA3ONHWAO5 97 R233
Red Hill Creek Watershed Study: report on known and potential contaminant sources: draft for discussion
Regional Municipality of Hamilton-Wentworth
July 10, 1997
CA3ONHWAO5 97 R263D
Red Hill Creek Watershed Plan: Water Quality Report
Regional Municipality of Hamilton-Wentworth
August 1997
CA3ONHWAO5 97 R232
Canadian Environmental Assessment Agency: ministerial guidelines: Canadian Environmental Assessment Act, s.58(1)(a): procedures for an assessment by a review panel
Red Hill Creek Expressway Review Panel
November 1997
CA1EA99 RM4
Red Hill Creek Watershed Study: Report on Known and Potential Contaminant Sources
Regional Municipality of Hamilton-Wentworth
December 11, 1997
CA3ONHWAO5 97 R236
Alive and well [video-recording]: a report on the Red Hill Valley Environmental Rehabilitation Project
CSW Productions
1997
R333.7209713 ALI (2nd floor)
A fluvial geomorphologic assessment of Red Hill Creek and its tributaries
Regional Municipality of Hamilton-Wentworth. Special Projects Office
1997?
R551.4420971352 FLU CESH
CA3ONHWAO5 97 R43
Red Hill Creek Expressway: North South Section: Community Stakeholders Committee
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 C57
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing air quality draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R241D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing fisheries draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R239D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing hydrogeological conditions draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R240D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing noise draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R243D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing surface water and water quality draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 F242D
Red Hill Creek Expressway: North-South section: impact assessment and design process: existing terrestrial resources draft technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R238D
Red Hill Creek Expressway North-South Section: Impact Assessment and Design Process: Visual Assessment - Escarpment Crossing Baseline Inventory and Impact Predictions
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R232D
Red Hill Creek Expressway: North South section: Information Brief
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 I51
Red Hill Creek Watershed Plan: Cultural Heritage Resources Technical Report -- Draft Version
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R231D
The Red Hill Creek Watershed Plan: Cultural Heritage Resources Inventory: Technical Report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R231
Red Hill Creek watershed plan: hydrogeological inventory
Prepared for the Regional Municipality of Hamilton-Wentworth by Terraqua Investigations Ltd. in association with Blackport and Associates.
1997
R553.790971352 TER CESH
CA3ONHWAO5 97 R237
Red Hill Creek Watershed Plan Study: Soils and Geology
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R235
Red Hill Creek Watershed Plan: Surface Water Report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R233
Red Hill Creek Watershed Plan: Terrestrial Resources -- Phase One Background Inventory -- Draft Technical Report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R232D
Red Hill Creek Watershed Plan: Terrestrial Resources: Phase 1 background inventory: technical report
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R232
Red Hill Creek Watershed Study: Fisheries -- Phase One: Background Inventory (Working Draft for Discussion)
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R234D
Red Hill Creek Watershed Study: Fisheries: Phase 1: background inventory
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R234
Soils and geology: Red Hill Creek watershed plan study
Regional Municipality of Hamilton-Wentworth. Special Projects Office
1997?
R551.700971352 SOI CESH
State of the Watershed report: Red Hill Creek Watershed Planning
Regional Municipality of Hamilton-Wentworth
1997
R333.70971352 STA CESH
Red Hill Creek Watershed Planning Process: first generation plan for discussion: second draft
Regional Municipality of Hamilton-Wentworth
1997
CA3ONHWAO5 97 R244D
Red Hill Creek Expressway Books: 1998
Red Hill Creek Expressway: north-south section: briefing sessions April 1, 1998 : stormwater management and creek realignment
Video
1998
Sherwood Library
Red Hill Creek Expressway: north-service section: briefing sessions April 7, 1998: site contamination and vegetation/wildlife
Video
1998
Sherwood Library
Red Hill Creek Watershed Action Plan: first generation plan: final draft
Regional Municipality of Hamilton-Wentworth
April 1998
CA3ONHWAO5 98 R246
Red Hill Creek Watershed Action Plan: compendium of actions
Regional Municipality of Hamilton-Wentworth
April 1998
CA3ONHWAO5 98 R245
Red Hill Creek Expressway North-South Section: impact assessment and design process: draft summary report: Vol. 2
Regional Municipality of Hamilton-Wentworth
July 1998
CA3ONHWAO5 98 R231
Air quality assessment North-South Section Red Hill Creek Expressway: Hamilton, Ontario: draft
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 T33D
From Mountain to lake: the Red Hill Creek Valley
edited by Walter G. Peace
Conserver Society of Hamilton and District
1998
R971.352 FRO CESH
Red Hill Creek Expressway: Phase 1 Environmental Site Assessment: draft for discussion
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 R244D
Red Hill Creek Expressway: Phase 2 Environmental Investigation: draft for discussion
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 R245D
Red Hill Creek Expressway North-South Section: Executive Summary
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 R250E
Red Hill Creek Expressway Impact Assessment: Terrestrial Resources: Technical Report
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 R246
The Red Hill Creek Expressway (North-South Section) Impact Assessment: Regional Municipality of Hamilton-Wentworth, Ontario: Summary Report of the Cultural heritage Resource Assessment
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 R247
Red Hill Creek Expressway (North-South Section) and Q.E.W. interchanges (Red Hill Creek Expressway and Burlington Street
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 R23E
Red Hill Creek Expressway / QEW interchange review: integration model - traffic operations analysis
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 R23Q
Thermal dynamics impact assessment North-South Section Red Hill Creek Expressway: Hamilton, Ontario: draft
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 T32D
Traffic noise impact assessment Red Hill Creek Expressway North-South Section: Hamilton, Ontario: draft
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 T34D
Vehicle air emissions inventory North-South Section: Red Hill Creek Expressway: Hamilton, Ontario: draft
Regional Municipality of Hamilton-Wentworth
1998
CA3ONHWAO5 98 V35D
Red Hill Creek Expressway Books: 1999
Canadian Environmental Assessment Agency: participant funding program: guide and application form
Red Hill Creek Expressway Review Panel
May 1999
CA1EA 99 RM1
Draft environmental impact statement (EIS) guidelines for the review of the proposed Red Hill Creek Expressway north-south section project
Red Hill Creek Expressway Review Panel
August 1999
CA1EA 99 SPD1
Red Hill Creek Expressway environmental assessment review panel: operational procedures
Red Hill Creek Expressway Review Panel
August 1999
CA1EA 99 SPD2
Agence canadienne d'evaluation environnementale: directive ministerielle: loi canadienne sur l'evalution environnementaile, alinea 58 (a) (a): procedures d'examen par une commission
Red Hill Creek Expressway Review Panel
November 1999
CA1EA 99 RM5
Area map of the proposed expressway
Red Hill Creek Expressway Review Panel
1999
CA1EA 99 RPD2
Care de la regional du projet propose
Red Hill Creek Expressway Review Panel
1999
CA2EA 99 RPD4
Draft terms of reference: panel review of the proposed Red Hill Creek Expressway
Red Hill Creek Expressway Review Panel
1999
CA1EA 99 RPD1
Mailout: letter to interested party: draft environmental impact statement (EIS) guidelines and review panel's operational procedures
Red Hill Creek Expressway Review Panel
1999
CA1EA 99 SG1
Mandat de la commission d'examen a l'egard du projet de l'autoroute du ruisseau Red Hill
Red Hill Creek Expressway Review Panel
1999
CA1EA 99 RPD5
Terms of Reference: panel review of the proposed Red Hill Creek Expressway
Red Hill Creek Expressway Review Panel
1999
CA1EA 99 RPD3
Agence canadienne d'evaluation environnementale: apercu des directives ministerielles sur l'examen par une commission federale
Red Hill Creek Expressway Review Panel
1999
CA1EA 99 RM3
Canadian Environmental Assessment Agency: participant funding program: guide and application form
Red Hill Creek Expressway Review Panel
May 1999
CA1EA 99 RM1
Draft environmental impact statement (EIS) guidelines for the review of the proposed Red Hill Creek Expressway north-south section project
Red Hill Creek Expressway Review Panel
August 1999
CA1EA 99 SPD1
Red Hill Creek Expressway environmental assessment review panel: operational procedures
Red Hill Creek Expressway Review Panel
August 1999
CA1EA 99 SPD2
Agence canadienne d'evaluation environnementale: directive ministerielle: loi canadienne sur l'evalution environnementaile, alinea 58 (a) (a): procedures d'examen par une commission
Red Hill Creek Expressway Review Panel
November 1999
CA1EA 99 RM5
Area map of the proposed expressway
Red Hill Creek Expressway Review Panel
1999
CA1EA 99 RPD2
Care de la regional du projet propose
Red Hill Creek Expressway Review Panel
1999
CA2EA 99 RPD4
Draft terms of reference: panel review of the proposed Red Hill Creek Expressway
Red Hill Creek Expressway Review Panel
1999
CA1EA 99 RPD1
Mailout: letter to interested party: draft environmental impact statement (EIS) guidelines and review panel's operational procedures
Red Hill Creek Expressway Review Panel
1999
CA1EA 99 SG1
Mandat de la commission d'examen a l'egard du projet de l'autoroute du ruisseau Red Hill
Red Hill Creek Expressway Review Panel
1999
CA1EA 99 RPD5
Terms of Reference: panel review of the proposed Red Hill Creek Expressway
Red Hill Creek Expressway Review Panel
1999
CA1EA 99 RPD3
Agence canadienne d'evaluation environnementale: apercu des directives ministerielles sur l'examen par une commission federale
Red Hill Creek Expressway Review Panel
1999
CA1EA 99 RM3
Canadian Environmental Assessment Agency: overview of the ministerial guidelines for federal review panels
Red Hill Creek Expressway Review Panel
1999
CA1EA 99 RM2
Red Hill Creek Expressway Review Panel: referral: public announcements
Red Hill Creek Expressway Review Panel
1999
CA1EA 99 RPA
Red Hill Expressway Review Panel: scoping exercise: public announcements
Red Hill Creek Expressway Review Panel
1999
CA1EA 99 SPA
Red Hill Creek Expressway, North-South section: draft report, Niagara Escarpment
Expressway crossing alternative design report
Prepared by the former Region of Hamilton-Wentworth
1999
R388.40971352 HAM
Red Hill Creek Expressway Assessment Review Panel: Session 2: Morning: transcript of public scoping meeting taken on Friday, September 10, 1999 at Valley Park complex, Activity Room, 970 Paramount Drive, Hamilton, Ontario
1999
CA1EA99 SM4
Red Hill Creek Expressway Assessment Review Panel: Session 2: Afternoon: transcript of public scoping meeting taken on Friday, September 10, 1999 at Valley Park Complex, Activity Room, 970 Paramount Drive, Hamilton, Ontario
1999
CA1EA99 SM5 Special Collections
Red Hill Creek Expressway Assessment Review Panel: Session 2: Evening: transcript of public scoping meeting taken on Friday, September 10, 1999 at Valley Park Complex, Activity Room, 970 Paramount Drive, Hamilton, Ontario
1999
CA1EA99 SM6
Red Hill Creek Expressway Books: 2000-
The Red Hill Valley Program newsletter
City of Hamilton, 2002-
R388.10971352 RED
Red Hill Creek Expressway, North-South section: draft report, King’s Forest Golf Course impact assessment study
Prepared by Graham Cooke & Associates
2002
R388.40971352 GRA
A stream network inventory, fluvial geomorphologic assessment, impact assessment, and preliminary natural channel design of Red Hill Creek: prepared for the City of Hamilton
Prepared by Water Regime Investigations and Simulations Ltd.
2003
R551.4420971352 WAT
Red Hill Valley Project public consultation report
Prepared by Lura Consulting
2003
R388.40971352 LUR
The Red Hill Valley Project: impact assessment and design process summary report
City of Hamilton
2003
R388.40971352 HAM
The Red Hill Valley Project land use assessment report: prepared for the City of Hamilton
Prepared by Dillon Consulting
2003
R388.40971352 DIL
Red Hill Valley Project landscape management plan: [draft]
Prepared by Envision, the Hough Group...[et al]
2003
R713.0971352 ENV
Red Hill Creek Expressway, North-South section: snowdrifting assessment
Prepared by Rowan Williams Davies & Irwin, Inc.
2003
R388/40971352 ROW
Red Hill Creek Expressway, North-South section: traffic noise impact assessment
Prepared by Rowan Williams Davies & Irwin, Inc.
R388.40971352 ROW
Red Hill Creek Expressway, North-South section: air quality assessment
Prepared by Rowan Williams Davies & Irwin, Inc.
2003
R363.7392 ROW
Red Hill Creek Expressway, North-south section: vehicle air emissions inventory
Prepared by Rowan Williams Davies & Irwin, Inc.
2003
R363.7392 ROW
Red Hill Creek Expressway, North-south section: thermal dynamics impact assessment
Prpared by William Davies & Irwin, Inc.
2003
R551.660971352 ROW
Red Hill Creek Expressway, North-South section: post-construction ambient air quality monitoring for Lincoln Alexander Parkway
Prepared by Rowan Williams Davies & Irwin, Inc.
2003
R363.7392 ROW
Red Hill Creek Expressway, North-South section: pre-construction ambient air quality monitoring
Prepared by Rowan Williams Davies & Irwin, Inc.
2003
R363.7392 ROW
Red Hill Creek Expressway: contaminated sites impact assessment
Prepared by Dillon Consulting
2003
R363.7396 DIL
Predicted increases in respirable particulate matter (PM), NO2, CO2, and VOC near the Red Hill Valley Expressway: possible human health effects from exposure: prepared for the City of Hamilton
Prepared by Cantox Environmental Inc.
2003
R363.7387 CAN
Noise assessment (QEW section)
Ontario Ministry of Transport
2003
R388.40971352 NOI
Impact assessment and design process surface water and stormwater quality technical report: prepared for the City of Hamilton
Prepared by Philips Engineering Ltd.
2003
R553.790971352 PHI
Hydrogeologic inventory and impact assessment
Prepared by Blackport and Associates
2003
R553.790971352 BLA
Fisheries and the Red Hill Creek realignment study: prepared for the City of Hamilton
Prepared by C. Portt and Associates
2003
R333.95616C
Final terrestrial resources technical report. Prepared for the City of Hamilton
Prepared by Dougan & Associates
2003
R333.70971352 DOU
Escarpment crossing visual assessment: prepared for Regional Municipality of Hamilton-Wentworth
Prepared by Hough Woodland Naylor Dance Leinster
2003
R388.40971352 HOU
Economic impact to business at QEW interchange
Prepared by C.N. Watdon and Associates Ltd.
2003
R388.40971352 C
Cultural heritage resource assessment: prepared for the City of Hamilton
Prepared by Archaeological Resources Inc.: Unterman, McPhail, Cuming Associates; in association with Historica Research Ltd.
2003
R363.690971352 ARC
City of Hamilton southern flying squirrel study: prepared for the City of Hamilton
By Ewa Bednarczuk and Kevin Judge
2003
R599.369 BED
Red Hill Valley Archives [electronic resource]: July 31, 2004
Hamilton,Ont.: Friends of Red Hill Valley, 2004
CDROM
333.720971352 RED (Central Library CD ROM collection)
There is other material indexed in the Where-to-Look in Local History & Archives. This may include citations from other scrapbooks, periodicals, newspapers, etc.
To access these citations, please look in the Where-to-Look in Local HIstory & Archives under the heading:
Hamilton - Red Hill Creek Expressway